SPX 00 connection cover 605249
Suggested products
TECHNICAL DATA
Sales unit dimensions and weight: 1 pcs
SPX 00 connection cover 605249
Connection cover for fuse-switch disconnectors SPX
The SPX 00 connection cover is a key element of the switchgear system, providing safe insulation of electrical connections in installations using NH fuse switches. The component has been specifically developed for the SPX 00 switchgear with a rated current of 160A, guaranteeing full compatibility with the entire LEGRAND product series.
Construction and system compatibility
The cover is designed as a universal protective element that can be mounted as both a top and bottom cover in the switchgear system. The design corresponds exactly to the size of the NH00 fuse, ensuring a perfect fit for the SPX dimensions for a current of 160A.
The element is intended for mounting on the mounting plate, maintaining the full functionality of the entire switchgear assembly. It works with various types of connection terminals - jumper, screw, and prism-type - without limiting system configuration possibilities.
Safety and technical standards
The product meets the requirements of the IEC/EN 60947-3 standard, confirming its suitability for applications requiring the highest safety standards. The cover provides an additional layer of protection against accidental contact with live parts and protects connections from mechanical damage.
The packaging dimensions (200×60×50 mm) and low weight (0,1 kg) facilitate transport and installation without adding load to the switchgear structure. The element maintains dimensional stability at operating temperatures typical for electrical installations.
Application in installation practice
The cover is primarily used in modernizing existing installations where additional protection of connection points is necessary. It is particularly effective in industrial environments and facilities with increased operational safety requirements.
The element is especially useful during service and maintenance work on switchgear, when it is necessary to temporarily separate parts of the circuit from the remaining sections of the electrical installation.